One row per date, one column per line. Empty cells stay as gaps instead of dropping to zero, and the graph downloads as SVG or PNG with no account.
How to make a line graph
- Put the dates or steps in the first column, in order, one per row.
- Put each line’s values in its own column, with the line’s name in the header.
- Paste the cells in the Data panel. Each column becomes a line with its own colour.
- Decide whether the axis should start at zero, add axis titles, and download.
Order and spacing of the points
The points are placed in the order of the rows, at equal distances. That fits data recorded at regular steps: every month, every week, every version. If your dates are irregular, such as readings on the 1st, the 3rd and the 20th, equal spacing would distort the slope; use the scatter plot instead, with the day number as X, so the horizontal distances are true.
Zero or not zero
A line shows the shape of a change, and the choice of baseline changes how steep it looks. Starting at zero is the safe default and is what readers assume. Leave zero out when the values sit far from it and the variation is the point, and never do it to make a small change look dramatic.
How many lines
Up to four or five lines can be told apart by colour. Beyond that, the chart becomes a tangle: draw the one or two lines that matter in the sequential or categorical palette and consider leaving the rest out, or split the data into several small charts with the same axis.
Smoothing
Straight segments are the honest default: they show exactly where the measurements are. The smooth option joins the same points with a curve that never overshoots them. Use it for slowly changing quantities, and avoid it when each point is a separate count, because the curve suggests values in between.
If the amount under the line matters, see the area chart maker. To compare totals instead of trends, see the bar chart maker.